Provided overall project management for LandDesign during 2007 for all buildings under development at that time. Worked with Developer and multiple architects and other interested parties to coordinate drawings, utilities, streetscape, lighting and even crane swings. Was instrumental in removing a traffic circle from an area that was intended to be pedestrian friendly by illustrating to the owner's representatives that traffic circles have there place but not in pedestrian spaces. Worked with Sasaki and Associates in coordinating the utility and building coordination around the main plaza at the waterfront.

Images Courtesy LandDesign